The two new cranes towering over a huge cargo ship are tall enough to reach even the highest of the containers that are stacked up five on top of each other. Trucks are lined up on the newly built 400-meter (1,324-feet) quay of the deepwater Port of Berbera, in Somaliland, waiting for the containers to be offloaded.
Mohamed Atteye has been a shift manager at the Berbera terminal since 2021, when the facility reopened after two years of…